Projects
Since 1994
A brief history of the key projects undertaken by us.
Since 1994
A brief history of the key projects undertaken by us.
2021 – Ongoing : HITACHI ABB POWER GRIDS
MEW Substation Maintenance Services.
2020 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES (K.S.C.C)
Closeout Maintenance for MEW Substations.
2019 ongoing : Naser M. Al-Baddah & Partner General Trading & Contracting Co. (W.L.L) (NBTC)
Electrical & Instrumentation installation for KIPIC Project E30, NRP Mina Al Zour.
2014 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Office Staff, Receptionist & Office Boy for the Head Office.
2014 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Switchgear, Panel Board, Panel Assembling for Assembly Protection Relays.
1999 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Erection, Installation and Pre commissioning of MEW Substations, Telemetry jobs, Battery charging & maintenance.
2018 – 2020 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES (K.S.C.C)
SABIYA 750 MW CCGT Power Plant – EPC AND O&M Stage 3.
Construction and Installation of MEW Substation CONTRACT MEW/C/5200-2017/2018
2017 – 2019 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES (K.S.C.C)
KNPC “W” Substation – NRP. Construction and Installation of new Substation.
2013 – 2018 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
KOC Service contract 47013. MV-Drives Maintenance and Services. Burgan, Magwa & Abdali.
2016 – 2017 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Construction of new MEW Substation – WAFRA ‘Z’ Project. Construction and Installation of 400/132/11KV.
2015 – 2016 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Construction of new MEW Substation – KHIRAN ‘Z’ Project.
2015 – 2015 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
KNPC CONTRACT. Installation of 132 KV Substation AHRF “C” at MAA and 300/132 KV Substation MARF “W” at MAB.
2014 – 2015 : ABB ENGINEERING TECHNOLOGIES CO. KSCC
Carryout Electrical & Erection work for PIC
2013 – 2015 : MUSHRIF TRADING & CONTRACTING CO. (KSCC)
WJO – WAFRA JOINT OPERATIONS Project. Carry out Flowline & Piping jobs for the JV – SAUDI ARABIAN CHEVRON INC & KUWAIT GULF OIL CO.
2013 – 2014 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Construction of MEW Substation – UNIVERSITY ‘W’ Project.
2013 – 2014 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
KOC Contract 11050215. Construction of FOUR NEW 132/11KV Substations in North Kuwait, Burgan – C & Ahamadi – E. Telemetry and OPGW Stringing and Termination.
2013 – 2014 : SBC GENERAL TRADING & CONTRACTING CO
KOC BS 132 North Kuwait – Al Abdali. Mechanical and Piping jobs
2011 – 2012 : IMCO Engineering and Construction Company W.L.L.
Welding & Piping work for KOC
2011 – 2013 : KUWAIT CEMENT COMPANY (K.SC.)
Maintenance and Shutdwon for KCC 1.8 MTPY KILN
2007 – 2010 : IMCO Engineering and Construction Company W.L.L.
Construction of Mechanical, Electrical, Instrumentation and Installation of Evaporator System GT4 DWPS for DOHA West Power Station.
2005 – 2006 : HYUNDAI ENGINEERING & CONSTRUCTION CO, LTD
Boom Truck, Heavy equipment operator for Mina Al Ahamadi Refinery
2002 – 2010 : KUWAIT CEMENT COMPANY (K.SC.)
Mechanical jobs for KCC 1.8 MTPY KILN Project for clinker production.
2001 to 2009 : GULF SPIC GENERAL TRADING & CONTRACTING CO WLL
Fabrication, Erection & Testing of piping in KNPC Mina Abdullah Refinery.
2001 – 2002 : HILTON RESORT KUWAIT
Main contractor for Electrical works.
2000 – 2004 : AL BAHAR JACOROSSI ENGINEERING & CONSTRUCTION CO.
PIC Maintenance, Electrical and Shutdown activities.
2000 – 2001 : FURNACE FABRICA (INDIA) LTD
Carry out structural steel fire proofing at ALKYD USPE Resin plant at KCMC.
1999 – 2004 : EQUATE PETROCHEMICAL CO
Carry out EG Shutdown jobs & Mechanical jobs.
1999 – 2000 : ABDUL AZIZ YOUSUF AL-ESSA & CO, K.S.C.
Fabrication, welding and Installation of IRT pipe line for Shuaiba Refinery.
1997 – 2000 : INTEGRAL SERVICES CO. W.L.L.
Maintenance, shutdown and mechanical jobs for Mina Abdullah Refinery, Mina Al Ahamadi Refinery & Shuaiba Refinery.
1997-2000 : MITSUBISHI HEAVY INDUSTRIES
Carry out Mechanical & Electrical work for Mina Al Zour Distillation Projects.
1995 – 1996 : ITALIAN MARBLES EST
Accomplished Bayan Palace Rehabilitation Project.
1994 – 1997 : HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD
Carry out Mechanical & Electrical work for MEW Strip Project at Mina Al Zour & Mina Abdullah. Fulfil the Fabrication, General Fitting, Welding and repair of micro holes on weir pump casings.
1994 – 1996 : MITSUBISHI ELECTRIC CORPORATION (MELCO)
Carry out cable tray fixing, cabling, panel board connections, installation of lighting, communication grounding, LV SWGRS, motor fixing for different power projects in Kuwait.