Projects

Since 1994

A brief history of the key projects undertaken by us.

Project Highlights

2019 ongoing: Naser M. Al-Baddah & Partner General Trading & Contracting Co. W.L.L (NBTC) Electrical & Instrumentation installation for KIPIC Project E30, NRP Mina Al Zour 2018 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. SABIYA 750 MW CCGT Power Plant – EPC AND O&M Stage 3. Construction and Installation of MEW Substation CONTRACT MEW/C/5200-2017/2018 2017 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. KNPC “W” Substation – NRP. Construction and Installation of new Substation 2014 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. Office Staff, Receptionist & Office Boy for the Head Office 2014 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. Switchgear, Panel Board, Panel Assembling for Assembly Protection Relays 2013 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. KOC Service contract 47013. MV-Drives Maintenance and Services. Burgan, Magwa & Abdali 1999 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. Erection, Installation and Pre commissioning of MEW Substations, Telemetry jobs, Battery charging & maintenance 2016 – 2017 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. Construction of new MEW Substation – WAFRA ‘Z’ Project. Construction and Installation of 400/132/11KV 2015 – 2016 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. Construction of new MEW Substation – KHIRAN ‘Z’ Project 2015 – 2015 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. KNPC CONTRACT. Installation of 132 KV Substation AHRF “C” at MAA and 300/132 KV Substation MARF “W” at MAB 2014 – 2015 : ABB ENGINEERING TECHNOLOGIES CO. KSCC Carryout Electrical & Erection work for PIC 2013 – 2015 : MUSHRIF TRADING & CONTRACTING CO. (KSCC) WJO – WAFRA JOINT OPERATIONS Project. Carry out Flowline & Piping jobs for the JV – SAUDI ARABIAN CHEVRON INC & KUWAIT GULF OIL CO. 2013 – 2014 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. Construction of MEW Substation – UNIVERSITY ‘W’ Project 2013 – 2014 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C. KOC Contract 11050215. Construction of FOUR NEW 132/11KV Substations in North Kuwait, Burgan – C & Ahamadi – E. Telemetry and OPGW Stringing and Termination 2013 – 2014 : SBC GENERAL TRADING & CONTRACTING CO KOC BS 132 North Kuwait – Al Abdali. Mechanical and Piping jobs 2011 – 2012 : IMCO Engineering and Construction Company W.L.L. Welding & Piping work for KOC 2011 – 2013 : KUWAIT CEMENT COMPANY (K.SC.) Maintenance and Shutdwon for KCC 1.8 MTPY KILN 2007 – 2010 : IMCO Engineering and Construction Company W.L.L. Construction of Mechanical, Electrical, Instrumentation and Installation of Evaporator System GT4 DWPS for DOHA West Power Station. 2005 – 2006 : HYUNDAI ENGINEERING & CONSTRUCTION CO, LTD Boom Truck, Heavy equipment operator for Mina Al Ahamadi Refinery 2002 – 2010 : KUWAIT CEMENT COMPANY (K.SC.) Mechanical jobs for KCC 1.8 MTPY KILN Project for clinker production. 2001 to 2009 : GULF SPIC GENERAL TRADING & CONTRACTING CO WLL Fabrication, Erection & Testing of piping in KNPC Mina Abdullah Refinery. 2001 – 2002 : HILTON RESORT KUWAIT Main contractor for Electrical works. 2000 – 2004 : AL BAHAR JACOROSSI ENGINEERING & CONSTRUCTION CO. PIC Maintenance, Electrical and Shutdown activities. 2000 – 2001 : FURNACE FABRICA (INDIA) LTD Carry out structural steel fire proofing at ALKYD USPE Resin plant at KCMC. 1999 – 2004 : EQUATE PETROCHEMICAL CO Carry out EG Shutdown jobs & Mechanical jobs. 1999 – 2000 : ABDUL AZIZ YOUSUF AL-ESSA & CO, K.S.C. Fabrication, welding and Installation of IRT pipe line for Shuaiba Refinery. 1997 – 2000 : INTEGRAL SERVICES CO. W.L.L. Maintenance, shutdown and mechanical jobs for Mina Abdullah Refinery, Mina Al Ahamadi Refinery & Shuaiba Refinery. 1997-2000 : MITSUBISHI HEAVY INDUSTRIES Carry out Mechanical & Electrical work for Mina Al Zour Distillation Projects. 1995 – 1996 : ITALIAN MARBLES EST Accomplished Bayan Palace Rehabilitation Project. 1994 – 1997 : HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD Carry out Mechanical & Electrical work for MEW Strip Project at Mina Al Zour & Mina Abdullah. Fulfil the Fabrication, General Fitting, Welding and repair of micro holes on weir pump casings. 1994 – 1996 : MITSUBISHI ELECTRIC CORPORATION (MELCO) Carry out cable tray fixing, cabling, panel board connections, installation of lighting, communication grounding, LV SWGRS, motor fixing for different power projects in Kuwait.

2021 – Ongoing : HITACHI ABB POWER GRIDS
MEW Substation Maintenance Services.

2020 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES (K.S.C.C)
Closeout Maintenance for MEW Substations.

2019 ongoing : Naser M. Al-Baddah & Partner General Trading & Contracting Co. (W.L.L) (NBTC)
Electrical & Instrumentation installation for KIPIC Project E30, NRP Mina Al Zour.

2014 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Office Staff, Receptionist & Office Boy for the Head Office.

2014 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Switchgear, Panel Board, Panel Assembling for Assembly Protection Relays.

1999 – Ongoing : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Erection, Installation and Pre commissioning of MEW Substations, Telemetry jobs, Battery charging & maintenance.

2018 – 2020 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES (K.S.C.C)
SABIYA 750 MW CCGT Power Plant – EPC AND O&M Stage 3.
Construction and Installation of MEW Substation CONTRACT MEW/C/5200-2017/2018

2017 – 2019 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES (K.S.C.C)
KNPC “W” Substation – NRP. Construction and Installation of new Substation.

2013 – 2018 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
KOC Service contract 47013. MV-Drives Maintenance and Services. Burgan, Magwa & Abdali.

2016 – 2017 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Construction of new MEW Substation – WAFRA ‘Z’ Project. Construction and Installation of 400/132/11KV.

2015 – 2016 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Construction of new MEW Substation – KHIRAN ‘Z’ Project.

2015 – 2015 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
KNPC CONTRACT. Installation of 132 KV Substation AHRF “C” at MAA and 300/132 KV Substation MARF “W” at MAB.

2014 – 2015 : ABB ENGINEERING TECHNOLOGIES CO. KSCC
Carryout Electrical & Erection work for PIC

2013 – 2015 : MUSHRIF TRADING & CONTRACTING CO. (KSCC)
WJO – WAFRA JOINT OPERATIONS Project. Carry out Flowline & Piping jobs for the JV – SAUDI ARABIAN CHEVRON INC & KUWAIT GULF OIL CO.

2013 – 2014 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
Construction of MEW Substation – UNIVERSITY ‘W’ Project.

2013 – 2014 : SIEMENS ELECTRICAL & ELECTRONIC SERVICES K.S.C.C.
KOC Contract 11050215. Construction of FOUR NEW 132/11KV Substations in North Kuwait, Burgan – C & Ahamadi – E. Telemetry and OPGW Stringing and Termination.

2013 – 2014 : SBC GENERAL TRADING & CONTRACTING CO
KOC BS 132 North Kuwait – Al Abdali. Mechanical and Piping jobs

2011 – 2012 : IMCO Engineering and Construction Company W.L.L.
Welding & Piping work for KOC

2011 – 2013 : KUWAIT CEMENT COMPANY (K.SC.)
Maintenance and Shutdwon for KCC 1.8 MTPY KILN

2007 – 2010 : IMCO Engineering and Construction Company W.L.L.
Construction of Mechanical, Electrical, Instrumentation and Installation of Evaporator System GT4 DWPS for DOHA West Power Station.

2005 – 2006 : HYUNDAI ENGINEERING & CONSTRUCTION CO, LTD
Boom Truck, Heavy equipment operator for Mina Al Ahamadi Refinery

2002 – 2010 : KUWAIT CEMENT COMPANY (K.SC.)
Mechanical jobs for KCC 1.8 MTPY KILN Project for clinker production.

2001 to 2009 : GULF SPIC GENERAL TRADING & CONTRACTING CO WLL
Fabrication, Erection & Testing of piping in KNPC Mina Abdullah Refinery.

2001 – 2002 : HILTON RESORT KUWAIT
Main contractor for Electrical works.

2000 – 2004 : AL BAHAR JACOROSSI ENGINEERING & CONSTRUCTION CO.
PIC Maintenance, Electrical and Shutdown activities.

2000 – 2001 : FURNACE FABRICA (INDIA) LTD
Carry out structural steel fire proofing at ALKYD USPE Resin plant at KCMC.

1999 – 2004 : EQUATE PETROCHEMICAL CO
Carry out EG Shutdown jobs & Mechanical jobs.

1999 – 2000 : ABDUL AZIZ YOUSUF AL-ESSA & CO, K.S.C.
Fabrication, welding and Installation of IRT pipe line for Shuaiba Refinery.

1997 – 2000 : INTEGRAL SERVICES CO. W.L.L.
Maintenance, shutdown and mechanical jobs for Mina Abdullah Refinery, Mina Al Ahamadi Refinery & Shuaiba Refinery.

1997-2000 : MITSUBISHI HEAVY INDUSTRIES
Carry out Mechanical & Electrical work for Mina Al Zour Distillation Projects.

1995 – 1996 : ITALIAN MARBLES EST
Accomplished Bayan Palace Rehabilitation Project.

1994 – 1997 : HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD
Carry out Mechanical & Electrical work for MEW Strip Project at Mina Al Zour & Mina Abdullah. Fulfil the Fabrication, General Fitting, Welding and repair of micro holes on weir pump casings.

1994 – 1996 : MITSUBISHI ELECTRIC CORPORATION (MELCO)
Carry out cable tray fixing, cabling, panel board connections, installation of lighting, communication grounding, LV SWGRS, motor fixing for different power projects in Kuwait.